Design and Construction of Sakawagawa No. 1 Bridge
Satoshi MIURA, Yuji ASANO, Takehiko KITAGAWA, Katsuhiko MIZUNO |
13 |
|
|
|
|
Hiketa Pedestrian Bridge
\The World's Largest PC Through Girder Type Pedestrian Bridge UFC\
Takahiro MATSUYAMA, Akira MIYAJIMA, Katsuhiko YOKOHATA, Yasuo HIRAI |
21 |
|
|
|
|
Design and Construction of PCLNG Aboveground Storage Tank Using
New Structural Model
Kazushige NISHIHARA, Shinya MIZOGUCHI, Atsushi IMAMURA, Yuuki KOBAYASHI
|
30 |
|
|
|
|
Conversion Construction to the Pre-cast Prestressed Concrete Slab
\Igei Bridge (Down line) \
Kiyoshi ZAHA, Takahide YAMATO, Masaki YANAGITA, Yoshikazu HENZAN |
38 |
|
|
|
|
Research on the Pre-cast Prestressed Concrete Slab with New Type of
Reinforced Concrete Joint
Hiroyuki ABE, Hiroaki SAWADA, Satoshi OOTANI, Kengo HARA |
45 |
|
|
|
|
Study on Re-creation Technology of Prestressed Concrete Bridges
\Part 3 : Verification on Propriety of Removal of Prestressed Concrete
Member \@
Sadaaki NAKAMURA, Yuzuru HAMADA, Hideaki TANIGUCHI, Masayuki NAKAMURA |
54 |
|
|
|
|
Attainment of an Integral Abutment Bridge through the Refurbishment of
a
Simply Supported Structure Tobia Zordan, Bolina Ingegneria
Foreign Information Research Group |
61 |
|
|
|
|
Workshop on PC Bridges in Japan and Vietnam
Hiroshi MUTSUYOSHI, Ha MINH |
66 |
|
|
|
|
The 16th Symposium on Developments in Prestressed Concrete
Yoshinobu ISHIKAWA |
71 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|