|
|
Feature of Design and Construction of Partial Prestressed Concrete Rigid
Frame Viaduct
with Division Constructioin \Continuous Overpass Making Construction between
Mitaka
and Tachikawa Station of the Chuo Line\
Taichiro WATANABE, Kenichi NAGAYAMA, Tetsuo YAJIMA, Takeshi TSUYOSHI |
6 |
|
|
|
|
Construction of PC Composite Truss Bridge \Sarutagawa BridgeETomoegawa Bridge
(Up Line Construction)\
Jiro IWATATE, Osamu USAMI, Shinichi SASAKI, Tatsuya OHNO |
14 |
|
|
|
|
Construction of the 3 Span Continuation PRC Panel-stayed Bridge
\The Second AGATSUMA GAWA Bridge\
Takayuki OSATO, Ryusuke HIGASHI, Kazuhiro UTSUGI, Ichiro FUKUDA |
20 |
|
|
|
|
Report of Construction on the Hard Ground of PC Well (PPRC Structure)
Masaharu HIDA, Kunihiro SARUWATARI, Youichi SUNAKO, Yuichi SHIRAMIZU |
30 |
|
|
|
|
Memorandum after Temporary Transfer to Public Works Research Institute
Yuuki TAKEUCHI |
38 |
|
|
|
|
A Report of Visit to Amarube Bridge
Eiji SHINOZAKI |
44 |
|
|
|
|
A Report on the Workshop Relevant to Devision on the Standard of Design
and
Construction for PC Cable - stayed or Extradosed Bridges
Akira ARIKADO |
47 |
|
|
|
|
Boldness and Innovation in Concrete Design
Foreign Information Research Group |
52 |
|
|
|
|
fib Symposium 2009 and Bridge Survey in France and UK (England and Wales)
Taketo UOMOTO, Yoko KABAKI, Masaki KOBAYASHI, Matsuyoshi TAGUCHI |
57 |
|
|
|
|
An Easy-to-understand Lecture of a Concrete Structure Diagnosis No. 4 A Basic
Knowledge of the Concrete Structure (2)
Masayuki NAKAMURA, Hisao TATEGAMI |
64 |
|
|
|
|
|
|
|
|