Public Offering Research Committee

  1. HOME
  2. Committee Activities
  3. Public Offering Research Committee

Sub-Committee

  • Research Committee on Hamamatsucho Railway Station Passenger Platform Shed (finished in March, 2024)
  • Committee on Prestressed Concrete Hybrid Structure for Preventing Tsunami Disaster (finished in December, 2020)
  • Committee on Research and Design Guidelines for Prestressed Reinforced
     Concrete with Pretensioned High-Strength Rebar (finished in October, 2017)
  • Committee on Study of Prestressed Concrete Structure Capable of Supporting Large-Scale Natural Disasters (finished in March, 2018)
  • Research Committee on Structural Performance Elucidation and
     Effective Utilization Examination for Prestressed Concrete Members with Unbonded Prestressing Steel (finished in March, 2012)
  • Committee on Establishment of Restoration Design Method for Prestressed Concrete Structures (finished in March, 2010)
  • Committee on Research of Actual Conditions of Prestressed Concrete Engineering Education (finished in October, 2010)
  • ページの先頭へ戻る