|  | 
    
      | ● Design of YAHAGIGAWA Bridge on New Tomei Expressway Norio TERADA, Yasushi KAMIHIGASHI, Toru YAMAMOTO, Gen OKUYAMA
 | 14 | 
    
      |  |  | 
    
      | ● Construction and Vibration Test of the Extradosed Bridge With Corrugated Steel Web ―Himi Yume Bridge―
 Nobuyuki SAGAWA, Yuzo OKAZAWA, Shigeyuki SHIRATAKE, Hiroshi MASHIKO
 | 23 | 
    
      |  |  | 
    
      | ● Strengthening of CHOUFU Viaduct (TOKEI 213-Bridge) ―Strengthening Using Tensioning Method of CFRP Plates―
 Masami FUJITA, Kazuteru MORIKITA, Hideki TAKAHASHI, Hiroshi YASUMORI
 
 | 32 | 
    
      |  |  | 
    
      | ● Construction for Spalling-off Prevention of Iwakura Bridge Akira WAKUDA, Hirofumi KINOSITA, Takayasu INOUE, Masaru KANEKO
 | 39 | 
    
      |  |  | 
    
      | ● Reinforcement Design and Work of Kireuriwari Viaduct (Anti-subsidence
      Measure Using King-post Cables Recovered Deflection in A PC Rigid Frame Bridge with
      Central Hinge)
 Takeshi SUZUKI, Kosuke WAKATSUKI, Hideki MANABE, Hiroshi NISHI
 
 | 45 | 
    
      |  |  | 
    
      | ● Visitation Report of YAHAGIGAWA Bridge Junya OKAYAMA
 | 55 | 
    
      |  |  | 
    
      | ● Introduction of Strut and Tie Model Toshio ICHIHASHI
 | 57 | 
    
      |  |  | 
    
      | ● Bridge Over the Ebro River in the High Speed Railway ―Madrid-Barcelona-French Border (Spain) ―
 Foreign Information Reseach group
 | 62 | 
    
      |  |  | 
    
      | ● The Report of fib Symposium and the South French Bridges Research Tsutomu TAKECHI, Nobumasa SUZUKI, Yukikazu TSUJI
 | 68 | 
    
      |  |  |  | 
    
      |  |  |  | 
    
      |  |  |  | 
    
      |  |  |  | 
    
      | 
  
 
 
 |  |