      | ● Design and Construction of Shigaraki-dairoku and Shigaraki-Dainana-Bridges (Westbound Lanes) on New Meishin Expressway
 ― Prestressed Concrete Box-girder Bridge with Corrugated Steel Webs Built by
 the Pre-connecting Corrugated-web Method ―
 Toshiya IDE, Yasunori KOBAYASHI, Nobuhisa HIRAKI, Tsunehisa YAMAGUCHI
 | 18 | 
    
      |  |  | 
    
      | ● Design and Construction of Sugitanigawa Bridge ― Application of New Erection Methods ―
 Kenichiro ASHIZUKA, Akira TAKAHASHI, Masao TOHMA, Hitoshi KOBAYASHI
 | 26 | 
    
      |  |  | 
    
      | ● Design and Construction of Earthquake Proof Reinforcement Quay at Hourai・
      Sakura District in Tsuruga Port― Structural Pre-cast PC Pier Type Quay ―
 Masahiro TSUJI, Tetsuya AOYAMA, Katsu MIYAMOTO, Fumio NISHIMURA
 | 34 | 
    
      |  |  | 
    
      | ● Widening the Road by Precast Prestressed Concrete Structure Kikuo SUZUKI, Masataka YAMAMOTO, Masumi SHINDOU, Seijiro UCHIDA
 
 | 39 | 
    
      |  |  | 
    
      | ● Experimental Study on Joint of Square PC Pile for Earth Retaining Structure Toshiyuki NAKAMURA, Yusuke SATO, Hiroyuki ABE, Kengo HARA
 | 47 | 
    
      |  |  | 
    
      | ● Hardening Characteristic Verification of Moisture Curing Pre-grout PC Strand Keiichi AOKI, Hiroshi MASHIKO, Hiroyoshi WATANABE, Koichiro NATORI
 | 54 | 
    
      |  |  | 
    
      | ● Why Did Palau Bridge Collapse? Chris Burgoyne, Richard Scantlebury Foreign Information Reseach Group
 | 64 | 
    
      |  |  | 
    
      | ● The Start of Certification Test for Diagnosis Expert on Concrete Structures Taketo UOMOTO, Junichiro NIWA
 | 70 | 
    
      |  |  | 
    
      | ● Report of Research Committee on Performance-Based Design of Prestressed Concrete Structures
 ― Required Performances and Performance Verification of
 Prestressed Concrete Structures ―
 Research Committee on Performance Based Design of PC Structures
 | 76 | 
    
      |  |  |  | 
    
      |  |  |  | 
    
      |  |  |  | 
    
      |  |  |  | 
    
      | 
  
 
 
 |  |