 |
 |
JPCEA AWARDS
|
● Tokunoyama Hattoku Bridge
Structural Type:3-span extradosed bridge |
Location:Gifu |
Bridge Length:503.0 m |
Span:139.7 m+220.0 m+139.7 m |
Width:7.0 m |
Design:Oriental Consultants |
Construction:Oriental Shiraishi,Kawada
Construction,Showa Concrete JV
|
 |
|
● Tenmagawa Bridge
Structural Type: 3-span arch bridge |
Location: Aomori |
Bridge Length: 180.400m |
Span: 56.425m+66.050m+56.425m |
Width: 10.5m |
Design: East Japan Railway Company, JR East
Consultants Company |
Construction: Tekken Corporation,
Sumitomo Mitsui Construction JV
|
 |
|
|
|
|
● Mikaneike Bridge
Structural Type: 2-span UFC box girder bridge |
Location: Fukuoka |
Bridge Length: 81.2m |
Span: 39.9m+39.9m |
Width: 3.0m |
Design: Taisei Corporation |
Construction: Taisei Corporation
|

|
● Yamate Tunnel Ventilation Tower
Structural Type: Ventilation Tower |
Location: Tokyo |
Height: 45.0m |
Cross Section: Hexagon |
Design: Metropolitan expressway Company, Docon,
Daikien Sekkei |
Construction: Hazama,Toyo,Taihei JV,
Obayashi,AsunaroAoki JV, Tokyu Totetsu,
Hokudo Sogo JV, Kumagai,Penta Ocean,
Fukuda JV, Konoike, Nippon Engineering
Consultants, Sata JV, Konoike, Seibu,Saiki JV,
Shimizu,Toa,Ando JV, Obayashi, Takenaka Civil
Engineering,Seibu JV
|

|
|
|
● Mukogawa Women's
University Architecture Studio
Structural Type: RC+PcaPC+S |
Location: Hyogo |
Number of Stories: 3 stories |
Building use: university |
Floor space: 3860m2 |
Total floor space: 7560 m2 |
Design: Nikken Sekkei |
Construction: Takenaka Corporation |
PC Construction: P.S. Mitsubishi Construction
|

|
● Himekawa Bridge
Structural Type: 7-span fin back bridge |
Cable-stayed Bridge |
Location: Niigata |
Bridge Length: 462.0m |
Span: 57.0m+69.0m+3@70.0m+69.0m+57.0m |
Width: 13.3m |
Design: Yachiyo Engineering |
Construction: P.S. Mitsubishi ,Kowa, Tokiwa JV
|

|
|
|
● Yamakiri Ichigou Viaduct |
● Sugitanikawa Bridge |
Structural Type: 15-span continuous girder bridge |
Location: Shizuoka |
Bridge Length: 717.0m,709.0m |
Span: 3@50.0m+5@45.0m+5@50.0m+47.0m+45.0m |
3@50.0m+5@45.0m+4@50.0m+2@47.0m+40.0m |
Width: 10.75m |
Design: Central Nippon Expressway Company,Asia
Air Survay, Sumitomo Mitsui Construction,
Abe Nikko Kogyo JV |
Construction: Sumitomo Mitsui Construction,Abe Nikko JV
|
 |
Structural Type: 6-span corrugated steel web bridge |
Location: Shiga |
Bridge Length: 445.39m |
Span: 49.09m+3@79.0m+94.0m+63.55m |
Width: 11.46m |
Design: Yachiyo Engineering,P.S. Mitsubishi,Koastu Kogyo JV |
Construction: P.S. Mitsubishi,Koatsu Kogyo JV
|

|
|
|
R&D Awards
|
● Development of jointing method for UFC
precast segments; Development of UFC
shallow girder |
● Riverside Senshu Footbridge |
Structural Type: UFC box girder bridge |
Location: Aichi |
Bridge Length: 28.007m |
Span: 22.500m |
Width: 4.0m |
Design: Yachiyo Engineering, Taisei Corporation |
Construction: Taisei Corporation
|
|
 |
|
Structural Type: UFC 3-span pedestrian bridge |
Location: Niigata |
Bridge Length: 30.500m |
Span: 2.000m+26.000m+2.000m |
Width: 3.5m |
Design: Kajima Corporation |
Construction: Chotetsu Kogyo,Kajima JV
|
 |
|
Construction Technology Awards
|
● Hikita pedestrian bridge
|
● Shinsukuta Bridge Repair Construction |
|
|
Structural Type: UFC girder bridge |
Location: Tottori |
Bridge Length: 64.500m |
Span: 63.300m |
Width: 2.000m |
Design: Asahi Consultant |
Construction: Abe Nikko Kogyo
|
 |
Structural Type: Simple beam bridge |
Location: Okinawa |
Bridge Length: 23.600m |
Span: 22.840m |
Width: 2.000m+16.000m+2.500m |
Design: Fuji p.s Corpration |
 |
 |
|