JPCEA AWARDS

●Tokyo International Airport International Airline
  District GSE Bridge

Location: Tokyo
Structural Type: UFC 3-box girder bridge
Bridge length: 48.0m
Span: 46.0m
Width: 15.0m
Design and
Construction:
TAISEI, KAJIMA, Penta-Ocean, Toa, KAJIMA
ROAD,and Taisei Rotec Cross-Work Item Construction JV


●Sannai Maruyama Bridge
Location: Aomori
Structural Type: 4-span extradosed bridge
Bridge length: 450m
Span: 74.18m+150m+150m+74.18m
Width: 13.85m
Design: Chiyoda Engineering Consultants
Construction: Zenitaka, Asanuma, Shida JV

●Yabegawa Bridge
Location: Fukuoka
Structural Type: 3-span cable-stayed bridge
Bridge length: 517.0m
Span: 126.0m+261.0m+126.0m
Width: 19.0m
Design: Chodai
Construction: Sumitomo Mitsui Construction, P.S. Mitsubishi JV,
Shimizu, Kawada Construction JV

●1.1/2 VIEW
Location: Kochi
Structural Type: PRC
Number of Stories: 2 stories
Building use: Cafe Restaurant & Boutique
Floor Space: 189.75u
Total floor space: 287.95u
Design: Masao Kawae, JSD, Terui Engineering
Construction: Tanaka Corporation, Uenogumi,
Shinsei Steel Corporation,KenKen


●Ichii Shinkin Bank New Office
Location: Aichi
Structural Type: SRC+S+PcaPC (Vibration Controlled Structure)
Number of Stories: 12 stories
Building use: Office
Floor Space: 1,400u
Total floor space: 10,000u
Design: Masao Nikken Sekkei, Kakimi Sekkei JV
Construction: Kajima, Nakamurakougyou, Sakakibara, Nakano JV

●Hoshigaura Kaigandori Bridge
Location: Hokkaido
Structural Type: RC+PC+S
Hybrid PC Langer Bridge
Bridge length: 66.4m
Span: 65.0m
Width: 6.24m
Design: Japan Transportation Consultants
Construction: Tekken Construction, Tsubono Construction JV

●Renewal of Concrete Slab Bridges at Okubi River Bridge
Location: Okinawa
Structural Type: 3-span and 6-span Continuous hollow slab bridge
Bridge length: 51.100m, 102.013m
Span: 16.550m+17.000m+16.550m,16.550m+4@17.000m+16.550m
Width: 2@10.650m
Design: Oriental Shiraishi Corporation
Construction: Oriental Shiraishi Corporation
First major renewal construction for a concrete slab bridge on
a mainline expressway in Japan



 R&D Awards

●Prestressed Concrete Falsework for Concrete Deck
  Construction
Location: Hong kong/ China (Stonecustters Bridge)
Structural Type: Cable stayed Bridge
Bridge length: 1,596m
Span: 1,018m
Width: 53m
Design: Ove Arup & Partners Hong Kong Ltd
Construction: Maeda, Hitachi, Yokogawa, Hshin Chong JV



 Construction Technology Awards

●Yamagata pref. Shinjo Minami High school lesson room
  seismic retrofit work
Location: Yamagata
Structural Type: RC
Number of Stories: 4 stories
Building use: High school
Floor Space: 855.49u
Total floor space: 2,636.0u
Design: Yasujima Architect Structural design office
Construction: Numatagumi Corporation
PC Construction: Fuji p.s. Corporation

●Yoshio Bridge
Location: Fukuoka
Structural Type: 6-span hollow slab-bridge
Bridge length: 217.5m
Span: 29.2m+4@39.33m+29.2m
Width: 18.0m
Construction: Fuji p.s. Corporation

●Akabuchigawa Bridge on The New Tomei Expressway
Location: Shizuoka
Structural Type: (West-bridge)6-span continuous PC box girder bridge with
corrugated steel web
(East-bridge)5-span continuous PC box girder bridge with
corrugated steel we
Bridge length: (West-bridge)404.0m
(East-bridge)481.0m
Span: (West-bridge)41.0m+56.0m+82.0m+92.0m+82.0m+48.8m
(East-bridge)99.55m+115.0m+80.0m+92.5m+91.3m
Width: 16.5m
Design: Central Nippon Expressway Company, Sumitomo Mitsui Construction,
Kyokuto Kowa
JV,
Nippon Koei, Kaihatsutoranomon Consultant,
Toyo-Giken Consulting Civil Engineers
Construction: Sumitomo Mitsui Construction, Kyokuto Kowa JV